Newly finished flat roof with a clean waterproof membrane and neat edge trims
Built to last, explained clearly

A new flat roof that stays watertight for years

A leaking flat roof is stressful, so we replace and install flat roofs for homes and businesses across the UK, and we explain every layer of the build-up before any work starts, with no jargon and no surprises.

  • Free quote, with no pressure to say yes
  • EPDM, GRP, felt and single ply, with honest advice on which suits your roof

Get your free quote

Tell us a little about your roof. We will come back to you with next steps.

Which flat roof system is right for you?

Each system has its own strengths, so we look at your deck, your falls and how you actually use the roof, then tell you which system we would choose and why.

Close view of a black EPDM rubber roofing sheet laid flat

EPDM rubber roofing

One large rubber sheet with very few joins. A good fit for bigger, simple roofs and for people who want little upkeep.

Close view of a smooth seamless GRP fibreglass roof surface

GRP fibreglass roofing

A tough, seamless finish that is formed on the roof. It copes well with awkward shapes, small roofs and areas people walk on.

Close view of bonded layers of roofing felt

Felt roofing

A tried and tested option with layers bonded together. It often suits tighter budgets and larger commercial roofs.

Close view of a grey single ply roofing membrane with a welded seam

Single ply membrane

A factory made sheet that is fixed or bonded in place. Common on commercial buildings and large flat areas.

Flat roof deck stripped back with layers ready to be rebuilt

Full flat roof replacement

We strip back, check the deck, set the falls and rebuild the layers, so water runs off and stays off.

SystemTypical lifespanBest for
EPDMTypically 20 to 30 yearsLarge, simple roofs
GRPTypically 25 to 30 yearsSmall or awkward roofs
FeltTypically 10 to 20 yearsTighter budgets
Single plyVaries by productCommercial roofs

What is under the surface

Most installers skip this part of the conversation, but we think you should understand exactly what you are paying for.

Warm roof

The insulation sits on top of the deck, with the waterproof layer above it. Because the deck itself stays warm, condensation is far less likely to form underneath it, which considerably reduces the risk of damp appearing inside the building.

Cold roof

The insulation sits below the deck, with a ventilated gap above it. Airflow matters here, so we check it before we cover anything.

We also check the deck for rot, set the falls so that water drains towards the outlets, and finish the edges and upstands properly, and your written quote lists every single step.

Questions people ask before they book

Which is better: EPDM, GRP or felt?

It depends on the size, shape and use of your roof, and on how much foot traffic and weather exposure it has to cope with, so we will recommend one system and give you the reasons behind that choice, which lets you decide with confidence.

How long does a flat roof last?

It depends on the system and how well it is installed. Felt typically lasts 10 to 20 years, EPDM 20 to 30 years and GRP 25 to 30 years, and ponding water and poor drainage shorten all of them.

How long does installation take?

Most roofs take a few days, depending on size and weather.

How much does a new flat roof cost?

The cost depends on the system you choose, the size and condition of the roof, how much insulation it needs and how easy it is to reach, so the most reliable way to find out is to send us the details in the quote form and receive a written quotation that sets out every stage of the work.

Can you repair my roof or does it need replacing?

If the damage is small, a repair can make sense. If the deck is wet or the covering is worn out, replacing it saves you paying twice.

Do I need planning permission or Building Regulations approval?

Often not for a like for like replacement, but insulation rules and conservation areas can change that. Changing the materials or the shape of the roof may need planning permission. Building Regulations usually apply when you re-cover a large part of the roof, and the insulation then has to be upgraded. The threshold differs between nations, so check with your local building control team.

Do you check for asbestos, and what about VAT?

Older roofs can hide asbestos, so we check before we strip anything.

Ready to stop worrying about your roof?

Send us a few details and we will arrange a free quotation at a time that suits you.

Get a free quote